Latvia
Winter will be costly at Rail Baltica construction sites
Protecting the construction work at the Riga Central Station and the Riga Airport terminal of the Rail Baltica railway project during the winter months will cost 420,000 euros, said Ēriks Diļevs, chairman of the board of SIA "Europas d