logologo

Easy Branches allows you to share your guest post within our network in any countries of the world to reach Global customers start sharing your stories today!

Easy Branches

34/17 Moo 3 Chao fah west Road, Phuket, Thailand, Phuket

Call: 076 367 766

info@easybranches.com
Bulgaria

The repair of Chaira Pumped Storage Hydro Power Plant has been completed

The repair of the second hydro unit at the Chaira Pumped Storage Hydro Power Plant has been completed, reported BNT. Caretaker Minister of Energy Vladimir Malinov is expected to inspect the facility in the presence of caretaker Premier Dimitar Glav

By: bnr.bg

  • Dec 23 2024
  • 0
  • 0 Views
The repair of Chaira Pumped Storage Hydro Power Plant has been completed
The repair of Chaira Pumped St

The repair of the second hydro unit at the Chaira Pumped Storage Hydro Power Plant has been completed, reported BNT. Caretaker Minister of Energy Vladimir Malinov is expected to inspect the facility in the presence of caretaker Premier Dimitar Glavchev. The Chaira Pumped Storage Hydro Power Plant has been out of operation since March 2022.

Once the tests are successfully completed, the facility is expected to resume operation in early 2025. The restoration of the third hydro unit is yet to come, and a procedure has been announced for the complete replacement of hydro units 1 and 4. Experts expect that when the Chayra Pumped Storage Hydro Power Plant is integrated into the energy system, it will ensure balance alongside the Kozloduy Nuclear Power Plant. 

Related


Share this page

Guest Posts by Easy Branches

all our websites

image